{"id":255184,"date":"2026-10-27T10:24:17","date_gmt":"2026-10-27T09:24:17","guid":{"rendered":"https:\/\/www.itta.net\/?p=255184"},"modified":"2026-10-27T10:25:01","modified_gmt":"2026-10-27T09:25:01","slug":"hybrid-project-management-agile-v-model","status":"publish","type":"post","link":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/","title":{"rendered":"Hybrid Project Management: Blending Agile and V-Model Without Chaos"},"content":{"rendered":"<em>Hybrid project management combines phase-based governance, inherited from the V-model, with iterative delivery inspired by agile. It works when each part of the project follows the pace that suits it, under a single governance. Here is how to split the work, steer it and avoid friction between the two worlds.<\/em>\n\n    <div class=\"quiz-ia-box\" id=\"quiz-ia\" data-lang=\"en\" data-read-label=\"Read the dedicated section\" data-color=\"#870087\" data-color-light=\"#f5e6f5\" style=\"background:linear-gradient(135deg,#fcf8fc 0%,#f5eef5 100%);border-radius:12px;padding:32px 36px;margin:32px 0;border-left:6px solid #870087;font-family:Montserrat,Arial,sans-serif;\">\r\n\r\n        <p style=\"font-size:1.5vw;font-weight:700;color:#870087;margin:0 0 6px;line-height:1.4;\">Where does your hybrid project stand?<\/p>\r\n                    <p style=\"font-size:15px;color:#555;margin:0 0 24px;\">Five questions to find what to act on first.<\/p>\r\n        \r\n                <div class=\"quiz-step\" data-step=\"1\" style=\"display:block;\">\r\n            <p style=\"font-size:16px;font-weight:700;color:#111;margin:0 0 14px;\">1 \/ 5 &mdash; Does your project already combine agile and the V-model?<\/p>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q1\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">Yes, without really deciding it            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q1\" value=\"1\" style=\"margin-right:10px;accent-color:#870087;\">Yes, partly by choice            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q1\" value=\"2\" style=\"margin-right:10px;accent-color:#870087;\">Yes, it was a deliberate choice from the start            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:0;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q1\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">I do not know            <\/label>\r\n            \r\n            <div class=\"quiz-nav\" style=\"display:flex;justify-content:flex-end;margin-top:16px;gap:8px;\">\r\n                                                    <button class=\"quiz-next\" data-next=\"2\" style=\"background:#870087;color:#fff;border:none;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:opacity .15s;\">Next<\/button>\r\n                            <\/div>\r\n        <\/div>\r\n                <div class=\"quiz-step\" data-step=\"2\" style=\"display:none;\">\r\n            <p style=\"font-size:16px;font-weight:700;color:#111;margin:0 0 14px;\">2 \/ 5 &mdash; Do you know which workstreams to run predictively?<\/p>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q2\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">No, everything is run the same way            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q2\" value=\"1\" style=\"margin-right:10px;accent-color:#870087;\">I have a hunch, without criteria            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q2\" value=\"2\" style=\"margin-right:10px;accent-color:#870087;\">Yes, based on clear criteria            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:0;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q2\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">It is not my role            <\/label>\r\n            \r\n            <div class=\"quiz-nav\" style=\"display:flex;justify-content:space-between;margin-top:16px;gap:8px;\">\r\n                                    <button class=\"quiz-prev\" data-prev=\"1\" style=\"background:#fff;color:#333;border:2px solid #ddd;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:border-color .15s;\">Previous<\/button>\r\n                                                    <button class=\"quiz-next\" data-next=\"3\" style=\"background:#870087;color:#fff;border:none;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:opacity .15s;\">Next<\/button>\r\n                            <\/div>\r\n        <\/div>\r\n                <div class=\"quiz-step\" data-step=\"3\" style=\"display:none;\">\r\n            <p style=\"font-size:16px;font-weight:700;color:#111;margin:0 0 14px;\">3 \/ 5 &mdash; How does management track the project?<\/p>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q3\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">Through several different reports            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q3\" value=\"1\" style=\"margin-right:10px;accent-color:#870087;\">With a schedule that ignores sprints            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q3\" value=\"2\" style=\"margin-right:10px;accent-color:#870087;\">With a single dashboard            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:0;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q3\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">It does not really track it            <\/label>\r\n            \r\n            <div class=\"quiz-nav\" style=\"display:flex;justify-content:space-between;margin-top:16px;gap:8px;\">\r\n                                    <button class=\"quiz-prev\" data-prev=\"2\" style=\"background:#fff;color:#333;border:2px solid #ddd;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:border-color .15s;\">Previous<\/button>\r\n                                                    <button class=\"quiz-next\" data-next=\"4\" style=\"background:#870087;color:#fff;border:none;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:opacity .15s;\">Next<\/button>\r\n                            <\/div>\r\n        <\/div>\r\n                <div class=\"quiz-step\" data-step=\"4\" style=\"display:none;\">\r\n            <p style=\"font-size:16px;font-weight:700;color:#111;margin:0 0 14px;\">4 \/ 5 &mdash; Are tolerances set on cost and time?<\/p>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q4\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">No            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q4\" value=\"1\" style=\"margin-right:10px;accent-color:#870087;\">Yes, but vague            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q4\" value=\"2\" style=\"margin-right:10px;accent-color:#870087;\">Yes, with clear escalation rules            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:0;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q4\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">I do not know this principle            <\/label>\r\n            \r\n            <div class=\"quiz-nav\" style=\"display:flex;justify-content:space-between;margin-top:16px;gap:8px;\">\r\n                                    <button class=\"quiz-prev\" data-prev=\"3\" style=\"background:#fff;color:#333;border:2px solid #ddd;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:border-color .15s;\">Previous<\/button>\r\n                                                    <button class=\"quiz-next\" data-next=\"5\" style=\"background:#870087;color:#fff;border:none;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:opacity .15s;\">Next<\/button>\r\n                            <\/div>\r\n        <\/div>\r\n                <div class=\"quiz-step\" data-step=\"5\" style=\"display:none;\">\r\n            <p style=\"font-size:16px;font-weight:700;color:#111;margin:0 0 14px;\">5 \/ 5 &mdash; Who decides the order of features?<\/p>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q5\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">Nobody clearly            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q5\" value=\"1\" style=\"margin-right:10px;accent-color:#870087;\">The project manager or the product owner, depending on the case            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:8px;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q5\" value=\"2\" style=\"margin-right:10px;accent-color:#870087;\">The product owner, within a set frame            <\/label>\r\n                        <label style=\"display:block;padding:12px 16px;margin-bottom:0;background:#fff;border:2px solid #ddd;border-radius:8px;cursor:pointer;font-size:15px;color:#333;transition:border-color .15s,background .15s;\">\r\n                <input type=\"radio\" name=\"q5\" value=\"0\" style=\"margin-right:10px;accent-color:#870087;\">The committee, every time            <\/label>\r\n            \r\n            <div class=\"quiz-nav\" style=\"display:flex;justify-content:space-between;margin-top:16px;gap:8px;\">\r\n                                    <button class=\"quiz-prev\" data-prev=\"4\" style=\"background:#fff;color:#333;border:2px solid #ddd;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:border-color .15s;\">Previous<\/button>\r\n                                                    <button id=\"quiz-ia-submit\" style=\"background:#870087;color:#fff;border:none;padding:12px 24px;border-radius:8px;font-size:15px;font-weight:700;cursor:pointer;font-family:Montserrat,Arial,sans-serif;transition:opacity .15s;\">See my result<\/button>\r\n                            <\/div>\r\n        <\/div>\r\n        \r\n        <div id=\"quiz-ia-result\" style=\"display:none;\"><\/div>\r\n\r\n    <\/div>\r\n    \n\n<h2 id=\"sommaire\">Table of Contents<\/h2>\n<ol>\n<li><a href=\"#pourquoi\">Why hybrid is becoming the norm<\/a><\/li>\n<li><a href=\"#definition\">What hybrid is, and what it is not<\/a><\/li>\n<li><a href=\"#decouper\">Deciding what to run as V-model and what as agile<\/a><\/li>\n<li><a href=\"#gouvernance\">One governance for two rhythms<\/a><\/li>\n<li><a href=\"#frictions\">Friction points to anticipate<\/a><\/li>\n<li><a href=\"#exemple\">A concrete example: a new customer portal<\/a><\/li>\n<li><a href=\"#competences\">The skills to develop<\/a><\/li>\n<li><a href=\"#conclusion\">Conclusion<\/a><\/li>\n<li><a href=\"#faq-projet-hybride\">FAQ<\/a><\/li>\n<\/ol>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/chef-projet-coordination-equipes-agile-infrastructure-1.webp\" alt=\"project manager coordinating an agile team and an infrastructure team\" loading=\"lazy\" \/><\/p>\n\n<p>The &#8220;agile versus V-model&#8221; debate has long pitted two camps against each other. On one side, advocates of detailed plans and approved milestones. On the other, fans of short sprints and evolving scope. In the field, however, most projects do not choose. They mix both, often without saying so.<\/p>\n\n<p>An annual budget, a fixed-price contract or a regulatory constraint imposes fixed milestones. Meanwhile, the software team delivers in iterations, because needs become clearer along the way. The project then becomes hybrid, often without anyone deciding it.<\/p>\n\n<p>That is where chaos begins: two rhythms, two vocabularies and no clear link between them. This article explains how to make hybrid a deliberate choice. You will see how to split the project, organize governance and anticipate friction points.<\/p>\n\n<h2 id=\"pourquoi\">Why hybrid is becoming the norm<\/h2>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/comite-pilotage-validation-jalon-1.webp\" alt=\"steering committee approving a project milestone in a bright room\" loading=\"lazy\" \/><\/p>\n\n<p>The clearest signal comes from certifications. Indeed, the <a href=\"https:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/certifications\/new-pmp-examination-content-outline-2026.pdf?rev=b618cf45573e4276a54151e7636c97bf\" target=\"_blank\" rel=\"noopener\">July 2026 PMP exam content outline<\/a> devotes about 60% of questions to agile and hybrid approaches. The remaining 40% cover predictive approaches. PMI therefore expects project managers to move comfortably between the two.<\/p>\n\n<p>Switzerland is heading the same way. The federal <a href=\"https:\/\/www.hermes.admin.ch\/en\/\" target=\"_blank\" rel=\"noopener\">HERMES 2022<\/a> method, used in public administration and beyond, supports either a classic or an agile implementation. Its own slogan sums it up: agile or not agile, with HERMES it is not a question.<\/p>\n\n<p>These changes reflect a simple reality. Few organizations can run an entire project in a purely agile way. They also have to be accountable, stick to budgets and meet external deadlines. Public procurement, for example, often requires specifications and formal approval steps. Conversely, freezing every requirement up front no longer works for digital projects. Hybrid thus becomes the point of balance.<\/p>\n\n<h2 id=\"definition\">What hybrid is, and what it is not<\/h2>\n\n<p>First, a clarification. A hybrid project is not an agile project without rules, nor a V-model with a daily stand-up added. It is a project where some parts follow predictive governance and others iterative delivery, by design.<\/p>\n\n<h3>Three common models<\/h3>\n\n<p>In practice, three setups come up most often:<\/p>\n\n<ul>\n<li><strong>Phase-based governance, agile delivery<\/strong>: the project moves forward in stages approved by a committee, and each stage is delivered in sprints;<\/li>\n<li><strong>Split by workstream<\/strong>: infrastructure, hardware or data migration follow a predictive plan, while software moves forward in iterations;<\/li>\n<li><strong>Agile then predictive<\/strong>: an exploratory phase in sprints validates the solution, then large-scale rollout follows a detailed plan.<\/li>\n<\/ul>\n\n<h3>The trap of accidental hybrid<\/h3>\n\n<p>Chaos rarely comes from the mix itself. Rather, it comes from a hybrid that nobody designed. For example, a team works in sprints, but management expects a detailed eighteen-month schedule. Every sprint that changes scope then looks like a slip. By contrast, a hybrid designed from the start states what is fixed and what can move.<\/p>\n\n<h2 id=\"decouper\">Deciding what to run as V-model and what as agile<\/h2>\n\n<p>The first decision is how to split the work. For each workstream, ask yourself one question: are the requirements known and stable, or will they become clearer as you go? The table below helps you decide.<\/p>\n\n<div style=\"overflow-x:auto;-webkit-overflow-scrolling:touch;max-width:100%;width:100%;margin:1rem 0 0.5rem 0;\"><table style=\"width:100%;min-width:560px;\">\n<thead>\n<tr><th>Criterion<\/th><th>Leans V-model<\/th><th>Leans agile<\/th><\/tr>\n<\/thead>\n<tbody>\n<tr><td>Requirements<\/td><td>Stable and known up front<\/td><td>Unclear or evolving<\/td><\/tr>\n<tr><td>Cost of change<\/td><td>High (hardware, contract, infrastructure)<\/td><td>Low (software, content)<\/td><\/tr>\n<tr><td>External constraints<\/td><td>Regulatory, with fixed dates<\/td><td>Few date constraints<\/td><\/tr>\n<tr><td>Access to users<\/td><td>Limited or occasional<\/td><td>Regular, with frequent feedback<\/td><\/tr>\n<tr><td>Dependencies<\/td><td>Strong, with suppliers<\/td><td>Team autonomous on its scope<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n\n<p>A single project can therefore fall into both columns. For example, migrating data from a legacy system often follows a strict plan, with rehearsals and a cutover date. The user interface, on the other hand, benefits from being built in iterations, with regular feedback.<\/p>\n\n<p>Keep one simple rule in mind: use the predictive mode where mistakes are expensive to fix. Save agile for areas where learning fast pays off more than planning everything.<\/p>\n\n<h3>Grey areas<\/h3>\n\n<p>Some workstreams do not clearly fit either column. This is often the case for an integration with a poorly documented legacy system. In that situation, start with a short exploratory phase in sprints. It helps clear up the unknowns. Then, once the risk is better understood, you can switch that workstream to predictive management, or keep it agile.<\/p>\n\n<h2 id=\"gouvernance\">One governance for two rhythms<\/h2>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cheffe-projet-planning-phases-sprints-1.webp\" alt=\"project manager presenting a phase plan and sprints on a screen\" loading=\"lazy\" \/><\/p>\n\n<p>At the heart of a successful hybrid project lies a single governance. Admittedly, two teams can work at different paces. However, management must read one dashboard, with the same milestones and the same decision criteria.<\/p>\n\n<h3>Phases to decide, sprints to deliver<\/h3>\n\n<p>PRINCE2 offers a useful framework here. In particular, it relies on managing by stages and managing by exception. In practice, the project board approves each stage and sets tolerances, for example on cost or time. As long as the team stays within these tolerances, it moves forward without escalating every decision. Our article on <a href=\"https:\/\/www.itta.net\/en\/blog\/prince2-7-discover-the-new-features-and-advantages-of-the-latest-edition\/\" target=\"_blank\" rel=\"noopener\">PRINCE2 7th edition<\/a> details these principles.<\/p>\n\n<p><a href=\"https:\/\/www.axelos.com\/certifications\/propath\/prince2-agile-project-management\" target=\"_blank\" rel=\"noopener\">PRINCE2 Agile<\/a> goes further by combining this governance with agile practices such as Scrum or Kanban. Generally, the method recommends fixing time and cost, then flexing scope. As a result, the team delivers the essential features first, and the rest adjusts to the time available.<\/p>\n\n<h3>News worth knowing<\/h3>\n\n<p>PRINCE2 Agile now exists in version 2. PeopleCert, which manages the certification, has announced the retirement of the version 1 certifications. The last day to take the exam is December 31, 2026. If you are aiming for this certification, prepare directly on the new version.<\/p>\n\n\n<figure class=\"wp-block-image size-large itta-cta-banner\" style=\"margin:2.75rem 0\"><a href=\"https:\/\/www.itta.net\/en\/trainings\/management\/project-management-management\/prince2-agile-foundation\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1810\" height=\"768\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo.png\" alt=\"PRINCE2 Agile Foundation training\" loading=\"lazy\" class=\"wp-image-275348\" srcset=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo.png 1810w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo-300x127.png 300w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo-1024x434.png 1024w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo-768x326.png 768w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo-1536x652.png 1536w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-en-sans-halo-600x255.png 600w\" sizes=\"auto, (max-width: 1810px) 100vw, 1810px\" \/><\/a><\/figure>\n\n\n<h2 id=\"frictions\">Friction points to anticipate<\/h2>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/equipe-projet-interfaces-lots-table-1.webp\" alt=\"project team discussing the interfaces between two workstreams around a table\" loading=\"lazy\" \/><\/p>\n\n<p>Even when well designed, a hybrid project creates areas of tension. Spotting them early prevents most conflicts.<\/p>\n\n<h3>Contract and scope<\/h3>\n\n<p>A fixed-price contract often describes a fixed scope. Yet agile assumes that scope evolves. The solution is to contract on objectives and a budget envelope, rather than an exhaustive feature list. Also include a simple mechanism to swap one feature for another of similar size.<\/p>\n\n<h3>Reporting<\/h3>\n\n<p>On one side, the board expects a percentage of completion, while the agile team talks in sprint goals. So translate sprint results into progress toward milestones. For example, show what the team has already delivered for the stage and what remains to be done.<\/p>\n\n<h3>Testing and acceptance<\/h3>\n\n<p>In a V-model, acceptance testing comes at the end of the project. In agile, by contrast, each sprint produces a tested increment. You therefore need to decide who validates what, and when. A good practice is to have users validate each increment, then keep an overall acceptance phase before going live.<\/p>\n\n<h3>Roles<\/h3>\n\n<p>Who decides on content: the project manager or the product owner? Without a clear answer, they end up stepping on each other&#8217;s toes. Usually, the project manager keeps responsibility for budget, deadlines and interfaces. The product owner decides the order of features within the agreed frame. As for the Scrum Master, if there is one, they help the agile team follow the framework and ease exchanges with the other workstreams.<\/p>\n\n<h3>Dependencies between workstreams<\/h3>\n\n<p>Finally, an agile workstream often depends on a predictive one, and vice versa. For example, the software team cannot test the integration until the infrastructure is ready. Make these dependencies visible in a shared schedule. A regular review between workstream leads also helps spot a blocker before it delays the whole project.<\/p>\n\n<h2 id=\"exemple\">A concrete example: a new customer portal<\/h2>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/developpeurs-test-portail-client-1.webp\" alt=\"developers and a business lead testing a new customer portal\" loading=\"lazy\" \/><\/p>\n\n<p>Consider a services company replacing its online customer area. The project includes three workstreams with very different constraints.<\/p>\n\n<p>First, the hosting infrastructure and the connection to the billing system. These elements depend on a supplier, a contract and a cutover date. They therefore follow a predictive plan, with approved milestones.<\/p>\n\n<p>Next, the portal itself. Customer needs become clearer as testing goes on. The team therefore builds it in two-week sprints, with a product owner from the customer service department.<\/p>\n\n<p>Finally, the migration of existing accounts. It follows a strict plan, with two dry runs before the real cutover.<\/p>\n\n<p>The steering committee meets at the end of each stage. It reviews a single dashboard: supplier milestones, features delivered by the portal team and migration status. Thanks to clear tolerances, the team can reorder features without calling a committee meeting. However, any delay on the cutover date is escalated immediately.<\/p>\n\n<p>After a few months, the results speak for themselves. Exchanges with the supplier stay on track, because the milestones do not move. Moreover, the portal improves with every sprint thanks to feedback from pilot customers. Above all, the committee no longer discovers problems at the last minute.<\/p>\n\n<h2 id=\"competences\">The skills to develop<\/h2>\n\n<p><img decoding=\"async\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/professionnels-formation-gestion-projet-1.webp\" alt=\"professionals attending a project management course in a bright room\" loading=\"lazy\" \/><\/p>\n\n<p>Running a hybrid project thus calls for a dual culture. You need to master the predictive framework and truly understand agile practices. Here are the skills that make the difference:<\/p>\n\n<ul>\n<li>splitting a project into workstreams based on their level of uncertainty;<\/li>\n<li>setting tolerances and escalation criteria for the board;<\/li>\n<li>translating agile progress into governance language;<\/li>\n<li>clarifying roles between project manager, product owner and Scrum Master;<\/li>\n<li>tailoring the method to the size and context of the project.<\/li>\n<\/ul>\n\n<p>In addition, several certifications validate these skills. The PMP now covers hybrid extensively, as our comparison of <a href=\"https:\/\/www.itta.net\/en\/blog\/pmp-vs-capm-certification-new-exam-2026\/\" target=\"_blank\" rel=\"noopener\">PMP vs CAPM<\/a> explains. PRINCE2 Agile, for its part, focuses on combining structured governance with agile practices. Lastly, HERMES remains a reference for Swiss public projects. You will find all our <a href=\"https:\/\/www.itta.net\/en\/trainings\/management\/project-management-management\/\" target=\"_blank\" rel=\"noopener\">project management courses<\/a> on our website.<\/p>\n\n\n<figure class=\"wp-block-image size-large itta-cta-banner\" style=\"margin:2.75rem 0\"><a href=\"https:\/\/www.itta.net\/en\/trainings\/management\/agile-and-scrum\/prince2-agile-foundation-et-practitioner-bundle\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1810\" height=\"768\" src=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo.png\" alt=\"PRINCE2 Agile Foundation and Practitioner training\" loading=\"lazy\" class=\"wp-image-275350\" srcset=\"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo.png 1810w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo-300x127.png 300w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo-1024x434.png 1024w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo-768x326.png 768w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo-1536x652.png 1536w, https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/cta-prince2-agile-foundation-practitioner-en-sans-halo-600x255.png 600w\" sizes=\"auto, (max-width: 1810px) 100vw, 1810px\" \/><\/a><\/figure>\n\n\n<h2 id=\"conclusion\">Conclusion<\/h2>\n\n<p>Hybrid project management is not a lukewarm compromise between two methods. When well designed, it gives each part of the project the pace that suits it. On the one hand, the V-model secures what is expensive to change. On the other hand, agile speeds up learning where needs evolve.<\/p>\n\n<p>The key remains governance: one dashboard, clear tolerances and defined roles. Start by splitting your next project workstream by workstream, then decide how to run each one. In this way, you will turn an accidental hybrid into a chosen one. Try this approach on a pilot project first, then extend it to other projects.<\/p>\n\n<h2 id=\"faq-projet-hybride\">FAQ<\/h2>\n\n<p><strong>What is hybrid project management?<\/strong><br\/>\nIt is a project that deliberately combines predictive, phase-based governance with iterative delivery inspired by agile, under a single governance.<\/p>\n\n<p><strong>Which parts of a project should follow the V-model?<\/strong><br\/>\nThose with stable requirements and costly changes: infrastructure, hardware, data migration or regulatory constraints.<\/p>\n\n<p><strong>Is PRINCE2 Agile suited to hybrid projects?<\/strong><br\/>\nYes. It combines PRINCE2 governance with agile practices such as Scrum or Kanban. Version 2 replaces version 1, whose exams end on December 31, 2026.<\/p>\n\n<p><strong>Does the PMP cover hybrid?<\/strong><br\/>\nYes. Since July 2026, about 60% of PMP exam questions cover agile and hybrid approaches.<\/p>\n\n<p><strong>Who decides on content in a hybrid project?<\/strong><br\/>\nUsually, the project manager keeps budget, deadlines and interfaces. The product owner decides the order of features within that frame. This clear split of roles is the foundation of any hybrid project management approach.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hybrid project management combines phase-based governance, inherited from the V-model, with iterative delivery inspired by agile. It works when each part of the project follows the pace that suits it, under a single governance. Here is how to split the work, steer it and avoid friction between the two worlds. Table of Contents Why hybrid [&hellip;]<\/p>\n","protected":false},"author":112,"featured_media":275352,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[2945],"tags":[],"class_list":["post-255184","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-management-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.5 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hybrid Project Management: Agile and V-Model Without Chaos<\/title>\n<meta name=\"description\" content=\"Hybrid project management: what to run as V-model, what as agile, and how to unify governance without chaos between teams.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Damien Crocq\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/\"},\"author\":{\"name\":\"Damien Crocq\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#\\\/schema\\\/person\\\/ca875e6c61a8f6f224901d4b48e1494f\"},\"headline\":\"Hybrid Project Management: Blending Agile and V-Model Without Chaos\",\"datePublished\":\"2026-10-27T09:24:17+00:00\",\"dateModified\":\"2026-10-27T09:25:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/\"},\"wordCount\":1853,\"publisher\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/gestion-projet-hybride-miniature-sticker.webp\",\"articleSection\":[\"Management\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/\",\"url\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/\",\"name\":\"Hybrid Project Management: Agile and V-Model Without Chaos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/gestion-projet-hybride-miniature-sticker.webp\",\"datePublished\":\"2026-10-27T09:24:17+00:00\",\"dateModified\":\"2026-10-27T09:25:01+00:00\",\"description\":\"Hybrid project management: what to run as V-model, what as agile, and how to unify governance without chaos between teams.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/gestion-projet-hybride-miniature-sticker.webp\",\"contentUrl\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/gestion-projet-hybride-miniature-sticker.webp\",\"width\":1376,\"height\":768,\"caption\":\"gestion de projet hybride entre agile et cycle en v\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/blog\\\/hybrid-project-management-agile-v-model\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.itta.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hybrid Project Management: Blending Agile and V-Model Without Chaos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.itta.net\\\/en\\\/\",\"name\":\"ITTA\",\"description\":\"Formations &amp; Certifications en Suisse Romande\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.itta.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":[\"Organization\",\"EducationalOrganization\"],\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#organization\",\"name\":\"ITTA\",\"alternateName\":\"IT TRAINING ACADEMY SA\",\"url\":\"https:\\\/\\\/www.itta.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/Logo-transparent.png\",\"contentUrl\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/Logo-transparent.png\",\"width\":1500,\"height\":623,\"caption\":\"ITTA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/ITTA\\\/100063747262936\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/1001738\",\"https:\\\/\\\/www.instagram.com\\\/itta_suisse\\\/\"],\"contactPoint\":{\"@type\":\"ContactPoint\",\"telephone\":\"+41 58 307 73 00\",\"contactType\":\"customer service\",\"availableLanguage\":[\"French\",\"English\"],\"areaServed\":[{\"@type\":\"Country\",\"name\":\"Switzerland\"},{\"@type\":\"Country\",\"name\":\"France\"}]},\"location\":[{\"@type\":\"Place\",\"name\":\"ITTA Geneve\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Route des Jeunes 35\",\"addressLocality\":\"Carouge\",\"postalCode\":\"1227\",\"addressRegion\":\"GE\",\"addressCountry\":\"CH\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":46.18274,\"longitude\":6.12922}},{\"@type\":\"Place\",\"name\":\"ITTA Lausanne\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rue des Cotes-de-Montbenon 16\",\"addressLocality\":\"Lausanne\",\"postalCode\":\"1003\",\"addressRegion\":\"VD\",\"addressCountry\":\"CH\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":46.52111,\"longitude\":6.62734}}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/en\\\/#\\\/schema\\\/person\\\/ca875e6c61a8f6f224901d4b48e1494f\",\"name\":\"Damien Crocq\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/damien-bio-1-100x100.jpg\",\"url\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/damien-bio-1-100x100.jpg\",\"contentUrl\":\"https:\\\/\\\/www.itta.net\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/damien-bio-1-100x100.jpg\",\"caption\":\"Damien Crocq\"},\"description\":\"Damien est un professionnel dynamique, passionn\u00e9 par le marketing digital et le r\u00e9f\u00e9rencement naturel. Dipl\u00f4m\u00e9 d'un master en Web Marketing, il a acquis une solide exp\u00e9rience en e-commerce et a enseign\u00e9 sur des th\u00e9matiques de marketing digital. Aujourd'hui, il occupe le poste de sp\u00e9cialiste en marketing digital chez ITTA. Toujours curieux et innovant, Damien reste avant tout un passionn\u00e9 des technologies \u00e9mergentes, de l'informatique, de l'IA et du r\u00e9f\u00e9rencement naturel.\",\"sameAs\":[\"https:\\\/\\\/www.itta.net\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/damien-crocq\\\/?originalSubdomain=fr\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hybrid Project Management: Agile and V-Model Without Chaos","description":"Hybrid project management: what to run as V-model, what as agile, and how to unify governance without chaos between teams.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/","twitter_misc":{"Written by":"Damien Crocq","Estimated reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#article","isPartOf":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/"},"author":{"name":"Damien Crocq","@id":"https:\/\/www.itta.net\/en\/#\/schema\/person\/ca875e6c61a8f6f224901d4b48e1494f"},"headline":"Hybrid Project Management: Blending Agile and V-Model Without Chaos","datePublished":"2026-10-27T09:24:17+00:00","dateModified":"2026-10-27T09:25:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/"},"wordCount":1853,"publisher":{"@id":"https:\/\/www.itta.net\/en\/#organization"},"image":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#primaryimage"},"thumbnailUrl":"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/gestion-projet-hybride-miniature-sticker.webp","articleSection":["Management"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/","url":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/","name":"Hybrid Project Management: Agile and V-Model Without Chaos","isPartOf":{"@id":"https:\/\/www.itta.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#primaryimage"},"image":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#primaryimage"},"thumbnailUrl":"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/gestion-projet-hybride-miniature-sticker.webp","datePublished":"2026-10-27T09:24:17+00:00","dateModified":"2026-10-27T09:25:01+00:00","description":"Hybrid project management: what to run as V-model, what as agile, and how to unify governance without chaos between teams.","breadcrumb":{"@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#primaryimage","url":"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/gestion-projet-hybride-miniature-sticker.webp","contentUrl":"https:\/\/www.itta.net\/wp-content\/uploads\/2026\/10\/gestion-projet-hybride-miniature-sticker.webp","width":1376,"height":768,"caption":"gestion de projet hybride entre agile et cycle en v"},{"@type":"BreadcrumbList","@id":"https:\/\/www.itta.net\/en\/blog\/hybrid-project-management-agile-v-model\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.itta.net\/en\/"},{"@type":"ListItem","position":2,"name":"Hybrid Project Management: Blending Agile and V-Model Without Chaos"}]},{"@type":"WebSite","@id":"https:\/\/www.itta.net\/en\/#website","url":"https:\/\/www.itta.net\/en\/","name":"ITTA","description":"Formations &amp; Certifications en Suisse Romande","publisher":{"@id":"https:\/\/www.itta.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.itta.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":["Organization","EducationalOrganization"],"@id":"https:\/\/www.itta.net\/en\/#organization","name":"ITTA","alternateName":"IT TRAINING ACADEMY SA","url":"https:\/\/www.itta.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.itta.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.itta.net\/wp-content\/uploads\/2023\/02\/Logo-transparent.png","contentUrl":"https:\/\/www.itta.net\/wp-content\/uploads\/2023\/02\/Logo-transparent.png","width":1500,"height":623,"caption":"ITTA"},"image":{"@id":"https:\/\/www.itta.net\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/people\/ITTA\/100063747262936\/","https:\/\/www.linkedin.com\/company\/1001738","https:\/\/www.instagram.com\/itta_suisse\/"],"contactPoint":{"@type":"ContactPoint","telephone":"+41 58 307 73 00","contactType":"customer service","availableLanguage":["French","English"],"areaServed":[{"@type":"Country","name":"Switzerland"},{"@type":"Country","name":"France"}]},"location":[{"@type":"Place","name":"ITTA Geneve","address":{"@type":"PostalAddress","streetAddress":"Route des Jeunes 35","addressLocality":"Carouge","postalCode":"1227","addressRegion":"GE","addressCountry":"CH"},"geo":{"@type":"GeoCoordinates","latitude":46.18274,"longitude":6.12922}},{"@type":"Place","name":"ITTA Lausanne","address":{"@type":"PostalAddress","streetAddress":"Rue des Cotes-de-Montbenon 16","addressLocality":"Lausanne","postalCode":"1003","addressRegion":"VD","addressCountry":"CH"},"geo":{"@type":"GeoCoordinates","latitude":46.52111,"longitude":6.62734}}]},{"@type":"Person","@id":"https:\/\/www.itta.net\/en\/#\/schema\/person\/ca875e6c61a8f6f224901d4b48e1494f","name":"Damien Crocq","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.itta.net\/wp-content\/uploads\/2024\/04\/damien-bio-1-100x100.jpg","url":"https:\/\/www.itta.net\/wp-content\/uploads\/2024\/04\/damien-bio-1-100x100.jpg","contentUrl":"https:\/\/www.itta.net\/wp-content\/uploads\/2024\/04\/damien-bio-1-100x100.jpg","caption":"Damien Crocq"},"description":"Damien est un professionnel dynamique, passionn\u00e9 par le marketing digital et le r\u00e9f\u00e9rencement naturel. Dipl\u00f4m\u00e9 d'un master en Web Marketing, il a acquis une solide exp\u00e9rience en e-commerce et a enseign\u00e9 sur des th\u00e9matiques de marketing digital. Aujourd'hui, il occupe le poste de sp\u00e9cialiste en marketing digital chez ITTA. Toujours curieux et innovant, Damien reste avant tout un passionn\u00e9 des technologies \u00e9mergentes, de l'informatique, de l'IA et du r\u00e9f\u00e9rencement naturel.","sameAs":["https:\/\/www.itta.net","https:\/\/www.linkedin.com\/in\/damien-crocq\/?originalSubdomain=fr"]}]}},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/posts\/255184","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/users\/112"}],"replies":[{"embeddable":true,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/comments?post=255184"}],"version-history":[{"count":2,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/posts\/255184\/revisions"}],"predecessor-version":[{"id":275357,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/posts\/255184\/revisions\/275357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/media\/275352"}],"wp:attachment":[{"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/media?parent=255184"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/categories?post=255184"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.itta.net\/en\/wp-json\/wp\/v2\/tags?post=255184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}